The manufacture and assembly of measurement bunkers of stainless steel and steel construction works of 6 silos with capacity of 50 m³ located in the water based paint facility were conducted according to the projects.
In static projects, the risk arising from the earthquake coefficient chosen for a different region was observed and made suitable with earthquake regulation and specifications of Turkey.